NJDFW Posted March 11, 2015 Share Posted March 11, 2015 3/11/15 - Sea Girt and Axel Carlson Reefs to Receive 6000 Tons of Concrete Bridge Rubble in May -- Delivered by Feed43 service View the full article Link to comment Share on other sites More sharing options...
makosnax Posted March 11, 2015 Share Posted March 11, 2015 Why not just create a separate reef? It would thin out the boats. Link to comment Share on other sites More sharing options...
BowhunterNJ Posted March 12, 2015 Share Posted March 12, 2015 It is a pretty big area as it existed before...wonder how much ocean floor area the 6000 tons would theoretically cover. I agree though, anything to spread the boats out more is a good thing. Link to comment Share on other sites More sharing options...
jerseyhunter Posted March 12, 2015 Share Posted March 12, 2015 6000 tons of concrete is 4,320 cubic yds. BowhunterNJ 1 Link to comment Share on other sites More sharing options...
makosnax Posted March 12, 2015 Share Posted March 12, 2015 An area with small piles here and there would be great for fluke drifts. Short drifting small pieces gets to be a lot of work, a marathon drift with small pieces would be great. Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now