Jump to content
tjfslaughter

Great Room Build

Recommended Posts

Here is the todo list between now and Thanksgiving (no particular order).

1.  Sand walls, prime and finish paint

2.  Stone fireplace and install mantle

3.  Sand and Finish floors

4.  Paint all trim

5.  Door knobs

6.  Install shower trims

7.  Install bathroom sink

8.  Install granite in the bathroom 

9.  Hang the Elk above the fireplace which started this project and move in. 

  • Like 5

Share this post


Link to post
Share on other sites
4 minutes ago, tjfslaughter said:

9.  Hang the Elk above the fireplace which started this project.  

:cheers:

Share this post


Link to post
Share on other sites
Keep up the good work! 

IMG_1683.JPGIMG_1682.JPG

Another thing off the list. Got the sink/faucet set and installed. Trying to peck at least one or two small items a night after work. Hopefully will be stoning the fireplace this weekend.



Sent from my iPhone using Tapatalk
  • Like 1

Share this post


Link to post
Share on other sites

Renos are brutal, I'm sure you guys are both getting burned out by this point (months ago really).  Everything takes longer than you think and often costs way more than you think...at least from my perspective (not doing the work).  Give you guys a lot of credit, you're very skilled to be doing all that.  Good luck with the remainder of both your projects! :up:

Share this post


Link to post
Share on other sites

IMG_1714.JPGIMG_1713.MOVIMG_1711.JPG

Put up about 5 gallons of paint this morning with the sprayer. Will sand the walls lightly and roll the second coat. Hopefully working on the stone work for the fireplace next weekend.

 

 

Sent from my iPhone using Tapatalk

 

  • Like 2

Share this post


Link to post
Share on other sites

Finally got some free time to work on the fireplace stone work. Might be sanding floors next weekend. 8C6BB970-4A92-4DB6-BEC7-F0700E0B1463.jpg


Sent from my iPhone using Tapatalk

  • Like 5

Share this post


Link to post
Share on other sites

Spent the day sanding floors yesterday. Got one coat of finish installed. Will get the second and final coat in this morning.IMG_0167.jpgIMG_0168.jpgIMG_0169.jpgIMG_0162.jpg


Sent from my iPhone using Tapatalk

  • Like 5

Share this post


Link to post
Share on other sites
That looks great Slaughter.  :up::up:


Slowly getting there. Should be picking up custom base moulding Wednesday and installing next weekend. Hoping to be watching Packers Giants game in the room when they play on 1 December.


Sent from my iPhone using Tapatalk
  • Like 1

Share this post


Link to post
Share on other sites

Started priming base mouldings. These will go in this weekend then we are onto the shiplap at the fireplace, Elk, and TV crap.IMG_0196.jpg


Sent from my iPhone using Tapatalk

  • Like 2

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


  • Recently Browsing   0 members

    No registered users viewing this page.

×
×
  • Create New...